The Day 1 operating model
The inner loop is how an engineer, or an agent, goes from a clean checkout to a green PR: edit, build, test, repeat, measured in seconds. Its full contract is development-process. The load-bearing rule of that standard, stated once and never restated, is this:
lefthook commands == CI commands == just targetsThe reproducible, pinned toolchain
The toolchain is layered, floor to ceiling: dev-setup.sh bootstraps the floor (installs mise itself plus host prerequisites); mise is the org's pinned-toolchain layer - a single polyglot binary, versions committed in .mise.toml so a laptop and a CI runner get the byte-identical toolchain; just is the canonical task surface; a devcontainer is optional editor/LSP parity on top of the first three. Every repo exposes the same canonical target names - build, test, lint, fmt, run, watch, bench, cov - so muscle memory and automation transfer across Rust, Go, and TypeScript repos. A repo may add repo-specific recipes but must not rename or omit a canonical target.
The parity contract
The pre-commit hook calls just fmt --check / just lint; CI calls the same just targets; both resolve tools through the same .mise.toml. There is no fourth, hand-written copy of any command anywhere. This is why "green locally, red in CI" becomes a near-impossible state instead of a daily tax. The git hook is a convenience and is bypassable (--no-verify); CI is the real, unbypassable gate. If a check ever passes locally and fails in CI, that is not a flaky test - it is a parity bug in this contract, and the fix is to close the gap, never to relax CI to match.
Trunk-based delivery and preview environments
main is protected; branches are short-lived; every change lands through a mandatory PR with linear history. Long-lived feature branches are an anti-pattern - incomplete work hides behind feature flags, not branches. Small, frequent PRs are the single biggest lever on lead time and review latency. Every PR produces a deploy preview on the same Terraform, secret pattern, and observability stack as production - environment parity, not a bespoke snowflake.
Measuring the loop honestly
DORA (deployment frequency, lead time for changes, change failure rate, MTTR) and SPACE are read at team level, as trends - never to rank individuals and never as a target to be gamed. A metric that becomes a target stops being a metric, which is why the standard pairs a throughput signal with a quality one (deployment frequency with change failure rate) and reviews the metric set quarterly.
This inner loop is the loop the request-lifecycle's implement stage runs in: a change leaves that stage only when fmt --check, lint, test, and the coverage gate pass locally and in CI, the PR has a deploy preview, and the lifecycle's own Definition of Done is satisfied.